IT RUNS!   

We are excited to announce our next big project. "Black Mariah" Our client has a very solid design in mind which makes our job much easier. Here is a build outline we are starting from.     

  • All metal body (minimal rust deterioration, minimal repair glass). Ok to replace floor pans. Want hood & trunk to be nosed & decked (no ornaments). Modest pin striping in place of emblems. Want the side chrome on body.
  • All chrome to be re-chromed. Front & rear bumpers with no bumper guards on them.
  • New tinted glass windshield, side & rear glass darkened to legal specs.
  • No continental kit, nor fender skirts. No rear radio antennae.
  • Bench seat ok; no high back bucket seats. Prefer roll n tuck. All black interior. Tilting steering wheel. SW 270' Tach & SW oil, alt, & temp gauges mounted under dash. Tach on steering wheel.
  • 14" chrome reverse wheels, baby moon hubcaps, and red line tires.
  • Lake pipe w/chrome cap on each side, that come out between front wheel & fender.
  • Raked with about 10" from bottom of bumper in front, and about 16" in back.
  • Black paint, 3-4 coats, (no clear?). Pin striping to be a contrasting purple/orchid. Same color for the words "Black Mariah" penned on the bottom rear of each front fender (kick panel area). Word "Black" above "Mariah", at a forty-five degree angle on fender.
  • Amber front turning signal lenses.
  • New A Frame parts with Wilwood disk brakes, cut springs to lower car.
  • Would like a built engine. A 327/350, or similar. A 4 sp tranny, 12 bolt posi, with traction bars. Gear ratio ? PS, PB. A new or rebuilt heavy duty radiator. Hurst shifter that curves over the bench seat.
  • 2" exhaust tubing, glass mufflers, coming out below the back bumper, about 4 feet apart; with chrome, straight extensions, mounted close to bottom of bumper.

First photo
Second photo

First photo

First photo
Second photo

First photo
Second photo

The floor padding and the sound barrier are being installed along with the dash wiring.

First photo
Second photo

The carpet and door panels have been installed.  Noticed that the carpet on the floor has left access opening so the seats can be installed and the door panels still need the automatic window openers installed.  What about the ash trays?

First photo
Second photo

We have brakes!

First photo

The steering column and dashing wiring is almost complete.  Soon we will need gauges and the steering wheel.

First photo

A shipment of Chevy parts have just arrived.  Let the work begin!

First photo
Second photo

The ash tray has been installed.

First photo
Second photo

The head liner and visor are almost completed.